- Add your team to your organization - Follow your orders in real-time - Download your files related to your orders - Access all LED products manuals - Submit RMA tickets - Follow your RMA status
- Add your team to your organization - Create LED quotations - Manage your LED projects - Access Artixium pricelists - Generate proforma invoices - Real-time statistics
A 50 sqm screen of 4 x 12 meters with our product: the "Iron" (Front Maintenance) in the biggest evangelical church in France, "Charisma Eglise Chretienne". The installation took about 36 hours by 4 technicians, with absolutely no setbacks.
Using the IRON cabinets 500 x 500 mm, P3.9 in front maintenance. The installation process was smooth. The screen of 50sqm was mounted, held by six truss, cabled and configured with ease.
3 DAYS PROGRESS
12 x 4 METERS • 192 CABINETS • 50 SQUARE METERS
After the screen was installed successfully, our team concluded with a training so the client can become 100% autonomous to handle the screen video content and maintenance themselves. The front maintenance on the IRON is intuitive and can be done by a single technician with ease.
Magnet modules are removable with the help of a tool shown on the picture above. Pull out and unplug the module, replace it with a new one. The module maintenance process is as simple as that.
Final touches were made to assure a good screen lifetime, it’s safe to say our Iron product was perfect for the job. Alignments of the cabinets and the screen quality is marvelous.